Pre-shipment inspection in China: a checklist before you pay the balance

By Daniel Ngissah

Who is this guide for? The factory says your order is ready. You have photos of twelve closed cartons, a balance invoice and a forwarder asking when the truck can collect. The cartons look tidy. You still can’t tell whether the handles inside match the sample you approved.

A buyer-commissioned pre-shipment inspection gives you a chance to check a sample from the finished order while the goods are still at the factory. Its value depends on what the inspector can see, what you asked them to check and what you agreed would happen if a check failed. Here is how to set up all three.

Book around the goods, the payment and the truck

Agree inspection access and release conditions when you place the order. Record who books the inspector, who pays for the visit or a repeat visit, when the balance is due and who authorises collection. If you’ve already agreed to pay at a different stage, get the supplier’s written agreement to any change. Purchase order example with inspection and payment terms.

Ask the factory for a dated breakdown by SKU: units ordered, finished, packed and available at the inspection address. Then check the inspection company’s own booking conditions. For example, QIMA describes its service as taking place when at least 80% of the order is complete. For a 300-bag order, that is 240 bags. If all 240 are one colour and the remaining 60 are the colour you most need checked, ask for a later visit or a separate check on that colour. QIMA’s pre-shipment inspection process.

Give the inspector a checklist for your product

Send the signed order, size drawing, dated artwork, packing instructions and a reference to the approved sample. State which checks cover every carton and which apply to sampled units. Here is a starting brief for the 300-bag order. The measurements belong to this example.

CheckEvidence to request
Quantity and identityRecord the finished and packed quantities. Photograph carton marks and compare SKU T01 and the 1/12 through 12/12 numbering with the packing plan.
DimensionsMeasure sampled bags at the points on the drawing. Record actual width and height against 38 × 42 cm and the agreed ±0.5 cm tolerance.
Handle constructionPhotograph both ends of the handle beside the approved seam reference. For any load test, agree the load, duration and pass condition before the visit.
Print and finishCompare print position, spelling and colour to approved artwork A-02. Ask for close-ups of any smearing or incomplete print, with a ruler where size matters.
Packing and labelsOpen randomly selected cartons, count bags against the agreed 25 per carton and photograph labels. Record measured outside dimensions and gross weight for the forwarder.

Ask the inspector to select units from the available lot and record which cartons were opened. A row of samples already laid out by the sales team makes a good presentation. It tells you little about what’s inside carton 11.

Agree how defects will be counted

Put examples beside each defect class. You might classify a handle that detaches under the agreed test as major and a small cosmetic mark inside the bag as minor, depending on your agreed criteria. Identify safety issues separately and agree the action they trigger. A commercial visual inspection can check workmanship. Where the product requires lab testing or compliance documents, arrange those checks separately.

If your inspector proposes AQL sampling, ask them to identify the lot, standard and edition, inspection level, sample size, and acceptance and rejection counts by defect class. ISO 2859-1:2026 describes sampling schemes for inspecting lots by attributes. An AQL of 2.5 is not an instruction to count 2.5% of your order as saleable defects. Ask the inspector to show how its plan produces a decision for this particular lot. ISO’s description of the sampling standard.

Read the exceptions before releasing the balance

Suppose the report confirms twelve cartons, but the inspector photographs bags measuring 37.2 cm wide. Your agreed range starts at 37.5 cm. Check how many units were measured, how many fell outside the range and which cartons supplied them. Ask whether the factory used the same measurement points. A close-up with the tape in the wrong place calls for a new measurement. A confirmed short panel calls for a corrective decision.

  • Release when the evidence meets the agreed criteria, outstanding checks are closed and the payment and shipment conditions are satisfied. Send written release to the supplier and forwarder.
  • Hold for clarification when a required test was skipped, a SKU was unavailable or the report leaves a discrepancy unexplained. List exactly what is needed and who will verify it.
  • Request correction and reinspection when a failure is confirmed. Identify the affected lot, agree how it will be sorted or reworked, and keep the original and follow-up reports together.

A useful closing email is short: “Please hold collection of PO TOTE-001. The width readings on page 4 fall below our agreed minimum. Please confirm the affected cartons, your sorting plan and the earliest date the corrected lot can be checked.” That gives everyone the same decision to act on before the truck arrives.